The primary health care center in Halba, Akkar, North Lebanon received a grant from the kingdom of Saudi Arabia for a 2.7 kWp solar PV system with lead-acid batteries. The system is designed to save the center a total of $591 per year on electricity cost and 4.1 tons of CO2 emissions.